2 March 2020 The new Centre for Tissue Repair (CTR) building has "topped out" having reached its maximum height. The construction of the CTR building is now entering its second year. The building has already attainted its full height of 4 floors . The next stage in construction will be the addition of the outside glass walls. Work will continue apace in 2019 to fit out the interior. The CTR will contain inter-connected lab and write-up space and on lower floors there will be seminar and meeting rooms and a cafeteria. Image Interior design of Centre for Tissue Repair reception area. Credit: 442. This article was published on 2024-07-08